pest control | rodent | cockroach | ant | mosquito | house fly | termite

SUBTERRANEAN TERMITE CONTROL

The control of subterranean termites starts with inspection to determine the infestation stage. For this purpose, all wood structure will be checked and this includes window and doorframes. After determine the extent of infestation, various option of control or treatment will be recommended.

THE TREATMENT

The treatment methods vary and include structural change, physical barrier and dusting (or powdering).

The most common methods in Malaysia are:

  1. Pre-Constructions Anti-Termite Treatment

    Soil is treated with termicide around foundation and under slabs to prevent termites from tubing up the foundation wall or entering cracks or other openings in the foundation and moving upward to attack wood members above.

  2. Pre-Constructions Anti-Termite Treatment

    Create a chemical barrier beneath the foundation and slab. Holes are drilled into the slab. The holes are approximately 18 inches deep or where the drill reaches the soil. Five (5) liters of approved termicide are pumped into each hole to create a barrier. The holes are drilled along all vertically standing structure 1-2 feet apart depending on the site situation, condition, type of flooring and soil properties. The holes will be sealed with cement.

WARRANTY

A Certificate of Warranty will be issued for all pre- and post-construction anti-termite treatments.

Pre-Constructions Anti-Termite Treatment-2 years Post-Constructions Anti-Termite Treatment-1 year

If there is a recurrence of termite infestation, we will re-treat the areas without charge.

A complimentary inspection will be scheduled to check on infestation and treatment.



company profile | pest control services | treatment | links | contact us | sitemap

Copyright © 2007-8 Vector Services Sdn Bhd. All Rights Reserved
Web Design and SEO by Acdra Malaysia.